A civil permit is required when proposing to install underground infrastructure. It is typically submitted in the form of a site plan drawing that clearly outlines what is being proposed. These drawings include details such as:
• Existing and proposed underground infrastructure
• Above-ground equipment (e.g., grade-level boxes, pedestals, cabinets)
• Construction notes and methodology
• Scope of work
• Key map and location references
• Relevant dimensions
The goal of the drawing is to demonstrate to authority having jurisdiction that the proposed installation complies with the requirements of the reviewing authority.
OSP Telecom
OSP Civil Permit (Telecoms)
Original price was: $2,000.00.$1,500.00Current price is: $1,500.00.
Reviews
There are no reviews yet.